|
Capabilities >
An integral part of any assurance system is the ongoing assessment of asset fitness-for-purpose (FFP).
IONIK has FFP experience in the upstream, midstream and downstream sectors of the Oil and Gas market. Additionally, we have specific experience in the provision of asset relifing or life extension services.
FFP analyses ensures not only that an asset is able to continue operation beyond is proposed working life but that this also complies to safety and environmental regulations and standards.

IONIK has direct project experience in conducting FFP assessments to the following codes and standards
 |
Corrosion: DNV RP F101 (ASD & PSF), ASME B31G, NG-18, Shell 92, RSTRENG (Simplified and Detailed) and AS 2885.3. |
 |
Crack & Fatigue Crack Growth: BS 7910. |
 |
Multiple Failure Modes: API RP 579 (general, local metal loss, pits, brittle fracture, blisters and laminations, cracks, weld misalignment/shell distortions/dents/gouges, creep, fire damage). |
 |
Span assessments: UK HSE guidelines, DNV Guideline 14, and DNV RP F105. |
 |
Stability assessments: AGA Level I, II & III, JPK Simulator. |
 |
Remaining life assessments based upon different corrosion growth models. |
IONIK adds direct value to its FFP assessments by providing the client with insight into future costs of repairs if degradation mechanisms are not controlled.
Fitness-For-Purpose
Relifing / Life Extension
Risk Management Services - Assets & Materials
|
|



|